Project
ACC Liverpool — Internal refurbishment
Architectural film refurbishment delivered around a busy programme—premium finish, minimal disruption, clean handover.
Liverpool
Events & hospitality
Architectural Film
4 weeks
the challenge
The venue needed a significant interior refresh but could not afford the downtime or cost associated with traditional replacement of surfaces. Work had to be completed around a high-density event schedule.
our solution
We implemented a phased architectural film refurbishment, targeting 10 different toilet blocks throughout the centre. Using 1500 meters of premium LG architectural film (now LX Hausys), we achieved a high-end aesthetic that is indistinguishable from replacement.

measurable impact
the strategic results delivered through our technical implementation
project details
Leading UK conference centre, ACC Liverpool wanted to uphold their first-class reputation with a complete refurbishment of their 10 different toilet blocks throughout the centre. After exploring many options, interior architectural film was the chosen solution.
Lustalux was onsite for 4 weeks installing the 1500 meters of premium LG architectural film (now LX Hausys) to the dated toilet cubicles. Rather than a full refit, that would take at least double the amount of time and create significant mess, the cubicles were simply wrapped in a modern finish.
“We’ve been open since 2008 and the toilets were starting to look quite dated. Initially, we had the idea of renovating the whole toilet, which includes ripping everything out to fit brand new toilet cubicles. Interior refurb film was the ideal solution for us as it was much more cost effective and cut down on waste and disruption.”
To install the refurb film, the team sanded and cleaned the panels, ready to directly apply the film to the surface. Each bathroom was transformed in 1-2 days with the project completed within a 4-week window.
“Lustalux has been really good from quotation right through to project management. We are a busy convention centre, and it was great that Lustalux could work around us, whilst being self-contained and needing very little from the venue team.”
If you’re looking to refurbish your premises in a cost-effective way, interior architectural film is for you. Not only is it more cost effective compared to a complete fit out, but it also reduces disruption and waste.
key outcomes
- Refreshed 10 different toilet blocks across the convention centre.
- Indistinguishable finish compared to full substrate replacement.
- Zero landfill waste by reusing existing cubicle structures.
- Work completed without closing the venue during events.
our approach
Preparation
Meticulous sanding and cleaning of existing panels to ensure perfect film adhesion.
Phased Install
Transforming each bathroom block in 1-2 days to maintain facility availability.
Project Management
Self-contained operation requiring minimal oversight from the venue team.
project faqs
Q: Why use film instead of new cubicles?
It's significantly more cost-effective, faster to install, and avoids the disruption and waste of a full rip-out and refit.
Q: How long does the installation take?
We transformed each toilet block in just 1-2 days, with the entire 10-block project completed in 4 weeks.