
Project
Everton Stadium at Bramley-Moore Dock
Glass manifestation applied to newly glazed openings in the hydraulic engine house at Bramley-Moore Dock, Liverpool, within a main-contractor and architectural-glazing package.
project details
- Location
- Liverpool
- Sector
- Sports & leisure
- Film type
- Glass manifestationStadium glazing manifestationConstruction glazing manifestationglass manifestation in Liverpool
- Timeline
- Delivered within the contractor and glazing programme
the challenge
Newly glazed openings in the listed hydraulic engine house / tower needed manifestation on clear glass as part of a contractor-led package on a heritage-sensitive Liverpool dockland site.
our solution
Lustalux applied manifestation to the newly glazed openings, working with the main contractor and architectural-glazing partner. The recorded Lustalux scope is this manifestation package, not the stadium's entire glazing or signage.
measurable impact
the strategic results delivered through our technical implementation
key outcomes
- Manifestation applied to newly glazed openings in the hydraulic engine house.
- Work delivered inside a main-contractor and architectural-glazing package.
- Specification responded to clear glass in a heritage-sensitive listed structure.
project details
Manifestation within a Liverpool glazing package
Lustalux applied glass manifestation to newly glazed openings in the hydraulic engine house at Bramley-Moore Dock, Liverpool. The work sat inside a main-contractor and architectural-glazing package on a listed dockland structure, not as a standalone decorative overlay.
The hydraulic tower, built in 1883, originally powered dock infrastructure. Restoration of the building required listed-building consent and new openings for a functional layout. Lustalux's recorded task was to apply manifestation to those new clear glass surfaces so the glazing was more apparent.
This page does not claim that Lustalux delivered the stadium's entire signage package, all stadium glazing, or all stadium manifestation. The project record names Laing O'Rourke as main contractor and Bennetts Architectural Glazing as the glazing partner.
For commercial window film, manifestation and signage across Liverpool and Merseyside, see glass manifestation in Liverpool.
Image credit: webbaviation.co.uk.
our approach
Glazing package
Manifestation coordinated with newly installed clear glazing rather than treated as a separate decorative extra.
Contractor environment
Delivered with Laing O'Rourke as main contractor and Bennetts Architectural Glazing as the installation partner recorded on the project.
Heritage context
The hydraulic tower is a listed dockland structure. Lustalux's recorded role is manifestation on the new glazed openings, not restoration of the building.
project faqs
Q: Did Lustalux deliver all the stadium glazing or signage?
No. The recorded Lustalux scope is manifestation applied to newly glazed openings in the hydraulic engine house. Wider stadium glazing and signage sit with other packages.
Q: Was this a listed-building context?
Yes. The hydraulic tower is a heritage-sensitive listed structure. Manifestation was applied to new clear glazing within that contractor package.
project gallery


related projects
view all
ACC Liverpool — Internal Refurbishment
Architectural-film refurbishment of ten existing facility areas at ACC Liverpool, programmed around the venue's events calendar.

Red Bull Harbour Reach Branding Case Study
Historic event graphics for Red Bull Harbour Reach at Liverpool's Albert Dock — vinyl wraps and branding on wakeboarding ramps and obstacles in a wet marine environment.
have a similar project in mind
discuss your requirements with a specialist and get a tailored quote for your space