sectors
Window film, signage & architectural finishes for construction and fit-out
The specialist finishing packages often arrive late in the programme — but they still have to be right first time. Lustalux works with main contractors, fit-out specialists, glazing contractors, architects and designers to deliver window film, manifestation, signage, graphics and architectural finishes across commercial projects throughout the UK.
From reviewing drawings and surveying glazing to RAMS, access coordination, installation and handover, we work as a specialist subcontractor within the wider project team — not simply as a product supplier.
The question a construction buyer asks is whether we will make the project easier to deliver. Occupiers looking to improve a workplace, store, school or hospital should start on the relevant sector page. This page is for the people responsible for delivering the package.
Drawings, schedules and specifications can be described in the enquiry or sent once we are in contact — the current form does not accept file uploads.
Trade partner
Main contractor & fit-out support
A specialist subcontractor inside the wider programme — not a product supplier handing over a box of film.
Site ready
RAMS & access planning
Site and project-specific RAMS for commercial installations, planned around the actual method of work.
UK-wide
Survey + installation
Teams from London, Manchester, Coventry, Scotland and Preston, coordinated around programme dates.
Multi-service
Glass, signs & surfaces
Window film, manifestation, signage, graphics and architectural finishes through one subcontract partner.
Supply-chain accreditations currently displayed across Lustalux are Constructionline, CHAS and SafeContractor. IPAF and PASMA relate to working-at-height competence for individual installers, not the same type of organisational scheme. Current insurance certificates are available on request. We do not publish an insurance figure or type on this page.





A specialist subcontractor that understands the wider programme
Main contractors and fit-out teams need a specialist who can read drawings, survey accurately, flag issues before manufacture, work to the architect's specification, submit technical information, produce samples, provide RAMS, attend inductions, coordinate with other trades and hand over without becoming the package everybody is chasing immediately before practical completion.
Lustalux has more than 30 years of commercial experience, dating to 1991, and long-standing main-contractor and fit-out relationships supported by the project archive. We work within the project's site-management and CDM arrangements applicable to our subcontract scope. We do not make the project CDM compliant — the principal contractor remains responsible for managing and coordinating the construction phase where the project involves multiple contractors.
Drawings & schedules
Review project information before production or installation so scope and interfaces are clear.
Site surveys
Confirm actual dimensions, glazing, substrates, access and site conditions before manufacture.
Specification support
Help translate the required visual or performance outcome into an appropriate film, sign or surface system within our agreed scope.
Site documentation
RAMS and relevant product information for the agreed commercial installation scope.
Programme coordination
Plan works around preceding trades, access windows, working-hour restrictions and handover.
Handover
Complete snagging and provide relevant product, warranty and cleaning information where required.
Send the information early and we can resolve more before site
The earlier we see the drawings and finish schedule, the more opportunity there is to flag substrate, access, glazing compatibility or programme issues before manufacture and installation. That is design and specification support within our agreed scope — not an appointment as designer for every surrounding package.
Drawings let us understand the design intent and scope. Where manufacture or installation depends on final built dimensions, a site survey or verified contractor dimensions may still be required. We do not manufacture every bespoke item directly from tender drawings without checking construction tolerances.
- GA drawings, elevations and interior elevations
- Glazing, door and sign schedules
- Room data sheets and finish schedules
- RCP or site plans where relevant
- Brand guidelines, artwork and material specifications
- NBS or specification clauses where relevant
- Proposed installation dates, site address and access details
- Handover or practical-completion date
If the project appoints Lustalux with specific design responsibility — for example sign structures, electrical signage, safety glazing systems, manifestation layouts or bespoke architectural finishes — the quotation and order should define exactly what that responsibility includes.
Alternative specifications when the original detail is difficult, expensive or disruptive
Value engineering is not automatically a cheaper product. It can mean lower cost, a shorter programme, easier installation, reduced strip-out, better availability, less weight or an easier change — depending on the application and subject to client or designer approval.
Architectural film instead of surface replacement
Where the existing substrate can be retained and a change of finish is the actual requirement.
Reeded film instead of specialist textured glazing
Where the project only needs the visual or privacy effect on suitable flat glazing.
Solar-control film instead of replacing otherwise suitable glazing
Where a retrofit film can meet the performance requirement without a full glass change.
Custom manifestation instead of generic dots
Where design intent can be integrated into an appropriate visibility scheme.
Architectural façade film instead of replacing suitable cladding
Where the substrate and system permit a film finish rather than panel replacement.
Keep the substrate. Change the finish.
Where a substrate is structurally suitable, in acceptable condition and technically compatible, architectural film can change colour, introduce a wood, stone or metal effect, refresh an existing element and avoid replacement solely for aesthetic reasons. That can reduce strip-out and help meet a programme constraint. It is not a universal substitute for replacement, and fire-door assemblies need their existing specification reviewed before any applied finish is specified.
- Doors
- Wall panels
- Reception counters
- Desks
- Cabinets
- Joinery
- Lift interiors
- Columns
- Toilet cubicles
- Selected furniture
- Feature surfaces


The Flower Bowl
Take work off site where the programme allows
For The Flower Bowl leisure development, parts of the architectural-film package could be prepared away from the active site. Doors were wrapped in Lustalux's workshop before being returned ready for hanging, while larger finishes were completed on site. Solar-control film was also installed to restaurant glazing.
Off-site preparation can mean a cleaner environment, less site congestion, work completed in parallel and a shorter on-site duration. It is reviewed project by project. We do not promise off-site finishing for items that cannot be transported, require final site measurements, could be damaged during subsequent construction, or have warranty or specification constraints.
View The Flower Bowl projectManifestation designed into the glazing package
Main contractors, glazing contractors, partition contractors, architects and fit-out teams typically need manifestation that responds to glass elevations, partition drawings, corporate branding, frosted bands, printed graphics and room privacy — not a last-minute decoration package. See glass manifestation.
For England, Approved Document K requires relevant transparent glazing to incorporate features that make it apparent where people are likely to come into contact with it. Scottish projects sit under Scottish Building Standards rather than Approved Document K. The useful checklist question is whether there is an approved manifestation design or applicable glazing-visibility specification — not whether a product is “DDA certified”.
Agree the manifestation installation window with the glazing and fit-out programme. Late installation risks dirty glass, curing silicone, other trades in the area, glass being replaced, graphics being damaged before handover, or access equipment being removed too early.
01
Receive glazing elevations
Identify which panes and doors are in scope.
02
Review design intent
Plain bands, logo, pattern, bespoke artwork or a combination.
03
Confirm visibility requirement
Work against applicable project and building requirements for the glazing.
04
Artwork / sample
Provide visuals where the design needs signing off before manufacture.
05
Verify site dimensions
Where manufacture depends on as-built conditions rather than tender drawings alone.
06
Manufacture
Pre-cut or print approved graphics.
07
Install
Coordinate after the glazing is sufficiently ready and accessible.
08
Snag
Replace any damaged or missing elements before handover.
Trade support for glazing and partition packages
Glazing and partition companies often supply clear glass, with Lustalux providing the finishing treatment afterwards. Useful information includes glass specification, pane dimensions, drawings, coatings, location, internal or external face, required finish and programme. Not every film is compatible with every glazing unit or coating — we review glazing information before specification where performance or compatibility matters.
- Manifestation
- Frosting
- Privacy film
- Decorative film
- Reeded film
- Safety film
- Solar-control film
- Bespoke glass graphics
Preston Bus Station
Specialist glazing interventions inside a major renovation
The site underwent a major renovation led by Conlon. Lustalux provided safety window film, manifestation and other graphics and signage to existing glazing as part of the wider works on a listed, sensitive asset. That is construction-programme proof — a main-contractor relationship, existing building, specialist glazing and coordinated installation — not a heritage badge on its own.
Explore the Preston landmark projects
Specialist glazing protection where the project specification requires it
Safety-film systems can be specified where an existing-glazing assessment identifies a required impact or fragment-retention performance. Whether an applied-film system achieves a required classification depends on the existing glass, film, installation, test evidence and application. Attaching a particular thickness of generic film does not automatically make any glass installation BS EN 12600 compliant.
Security and blast-mitigation systems require separate specialist specification around the glass, framing, attachment and defined threat or performance requirement. BS EN 12600 is not a blast-mitigation standard. We do not describe systems as bomb-proof, blast-proof or guaranteed protection. See security and safety film. This remains a supporting specialist capability for infrastructure, government, transport and high-risk commercial environments — not the central offer on this page.
Resolve glazing-performance problems without automatically replacing the glazing
Existing buildings being fitted out, new tenants with new comfort requirements, south-facing offices that overheat, atrium glare, or glazing that does not achieve the desired solar appearance can all be reasons to consider commercial solar-control film. We do not universally claim energy compliance, guaranteed HVAC saving or Building Regulations compliance without project-specific modelling and specification.
Finish glazed partitions without changing the glass specification
Meeting rooms, offices, pods, reception glazing, internal partitions, hospitality, healthcare and education fit-outs often need frost, gradient, reeded, decorative, bespoke-colour reeded, printed graphics, logos or text after the partition contractor has installed clear glass. See privacy film, reeded window film and coloured reeded film.

Harris Museum
When the film has to meet more than one performance requirement
The client needed UV, heat and visible-light control for museum roof glazing. Lustalux selected an external film around a specified visible-light target and installed it to four roof atria. That is a specification story — detailed performance brief, product selection, high-level access and external film — not primarily a heritage story.
View the Harris Museum projectFrom sign schedule to installed system
Fit-out signage can include main reception signs, exterior identity, wayfinding, room and door signs, directories, statutory or safety signs within Lustalux scope, illuminated signs, feature branding and tenant signage. See signage, bespoke signage, internal signage, external signage, illuminated signage and wayfinding.
Lustalux does not automatically take responsibility for every surrounding element. Supporting substrate, steelwork, primary power supply, final electrical connection, builder's work, access, making good, planning consent and structural engineering are defined according to the actual package.
01
Receive the sign schedule or brief
02
Survey
03
Resolve details and interfaces
04
Produce artwork or shop drawings where applicable
05
Approve colours and materials
06
Manufacture
07
Coordinate the electrical interface where relevant
08
Install
09
Snag
10
Hand over
- Supporting substrate
- Steelwork
- Primary power supply
- Final electrical connection
- Builder's work
- Access
- Making good
- Planning consent
- Structural engineering
Withington Girls' School
One subcontractor. Multiple finishing packages.
At Withington Girls' School, an initial glazing-graphics scope for the main contractor expanded into etch-effect manifestation, school-crest graphics, frosted privacy bands, solid privacy film, architectural wrapping, bespoke stainless-steel lettering and large perforated aluminium façade figures. That is exactly the advantage of having several specialist finishing capabilities available through one contractor.
Not every project contains glass, signs, graphics and surfaces. The value is fewer specialist packages to coordinate when more than one of those scopes is required.
View the Withington Girls' School project

Wesham Rehabilitation Centre
One specialist package across signs, graphics, film and surfaces
Lustalux was approached by Frank Whittle architects and Eric Wright Construction for a new NHS rehabilitation centre, delivering interior signage, exterior signage, bespoke murals, architectural wrapping and mirrored one-way window film. That is the multi-service proposition working in a real contractor and architect environment.
Explore the Wesham projectBroadhurst Optometrists
From construction hoarding to final shopfront
Lustalux was brought in by the shopfitting contractor and interior designer. The package included fit-out hoarding, wall graphics, acrylic branding, external signs, illuminated lettering and a projecting sign — coordinated around opening day. Shopfitters needing hoarding, window coverage, shopfront signs and internal branding through to opening should also see retail.
View the Broadhurst project

Printworks Manchester
Specialist signage within a major refurbishment programme
Lustalux contributed new gateway entrances and public-realm upgrades within the site's £21m refurbishment — a high-profile commercial project in a heritage-sensitive environment, delivered as part of the contractor and project-team programme.
View the Printworks projectWork backwards from handover
A specialist finish cannot be installed until the substrate or glazing is ready, but leaving the whole package until the final week creates unnecessary risk. Identify information and approval dates early, then programme final installation at the correct point in the sequence.
01
Survey
02
Information required
03
Artwork approval
04
Material / sample approval
05
Manufacture
06
Site readiness
07
Installation
08
Snag
09
Practical completion
Bring us in before the detail becomes a site problem. Early-stage support can include budget input, material options, samples, technical review, buildability feedback, access consideration, programme lead times and VE alternatives. That is not full design consultancy unless contracted as such.
Before our installation date
Site readiness is a shared responsibility. Confirming the following before the agreed window reduces rework, snagging and programme pressure.
Glazing film / manifestation
- Correct glazing installed
- Glass accessible
- Protective tape and labels removed as agreed
- Silicone and sealants sufficiently cured where relevant
- Glass free from construction contamination where possible
- Final dimensions agreed
- Other trades not likely to damage completed film
Architectural film
- Substrate complete
- Dry
- Stable
- Free from unresolved damage
- Decoration and adjacent works suitably progressed
- Hardware status agreed
- Access available
Signage
- Fixing substrate complete
- Sign location confirmed
- Power supply available where required
- Access available
- Surrounding finishes complete enough to install without rework
- Planning or landlord approval dealt with where that is the client's responsibility
Define the interface before installation
Most subcontract problems happen at interfaces. Agree who provides what before the programme reaches installation.
Manifestation
- Glazing contractor
- Partition contractor
- Cleaning
- Final finishes
Illuminated signage
- Electrical contractor
- Ceiling or wall contractor
- Steel / support
- Decorator
Architectural film
- Joinery
- Decorator
- Door hardware
- M&E where panels contain services
Solar film
- Glazing
- Façade
- Access
- Blinds
RAMS that relate to the actual installation
Site and project-specific RAMS can be provided where required for commercial installations. Documentation is produced around the actual installation method and site conditions — not offered as an empty “RAMS available” badge.
- Working at height
- MEWP use
- Drilling and fixings
- Glass-film installation
- Manual handling
- Public and occupant interface
- Access routes
- Exclusion zones
- Electrical signage
- Surface preparation
- Installation tools and materials
- Deliveries and waste
Ready to work inside your site controls
Send us the site rules and access requirements at order stage rather than discovering them on installation day.
- Site inductions
- Permit systems
- Signing in
- Security procedures
- Delivery booking
- Loading and unloading rules
- Working-hour restrictions
- Hot-work restrictions where relevant
- MEWP routes
- Exclusion zones
- Occupied areas
- PPE
- Housekeeping
High-level installation planned before the team arrives
External signs, atrium glazing, façades, roof lights, high-level manifestation and large wall graphics all need access surveyed first. The Harris Museum roof atria are useful technical proof of high-level external film. We do not advertise that we can install at any height.
- MEWP type
- Ground bearing and access
- Internal floor loading
- Height and reach
- Exclusion zone
- Traffic
- Weather
- Out-of-hours access
Fit-out and refurbishment in live environments
Construction is not always an empty shell. Offices, retail, healthcare, education, leisure and public buildings may need evenings, nights, weekends, phasing, area-by-area working or handover in sections. ACC Liverpool is supporting evidence for phased architectural-film work around a busy operational programme — ten toilet blocks and approximately 1,500 metres of film over a four-week programme. See ACC Liverpool.
Plan for snagging before practical completion
If something needs correcting, identify it early enough to resolve before handover. That is more credible than promising a perfect first-time result on every installation.
- 01Internal QC
- 02Contractor or client snag where required
- 03Record issues
- 04Return or replace if necessary
- 05Final clean
- 06Handover
Documentation the project team can actually file
Project-specific handover documentation can be provided where required within the agreed package. Agree O&M requirements at order stage.
- Product data sheets
- Warranty information
- Cleaning guidance
- Manufacturer information
- Film specification
- Signage specification
- Completion photographs
- As-installed schedules
- O&M information where applicable
Technical information before approval
We provide the manufacturer's current documentation relevant to the specified product. We do not promise every type of document for every material. Approve the finish before full production where samples are appropriate.
- Product datasheets
- Technical data
- Fire classification
- Safety-film test information
- Solar-performance data
- Manufacturer warranty information
- Samples
- Colour swatches
- Finish samples
- Drawings and artwork
Tendering a project?
Request a structured quotation from drawings, specification, scope, programme, site location, tender-return date and access assumptions. The quotation should identify what is included, excluded, assumed, optional and offered as an alternative.
Send tender documentsSite competence you can verify
CHAS, SafeContractor and Constructionline are organisational supply-chain accreditation schemes. CSCS is an individual skills-card scheme. IPAF is powered-access training. PASMA is mobile-access-tower training. They are not interchangeable certifications. Current insurance certificates are available on request.
- CHAS
- Constructionline
- SafeContractor
- IPAF
- PASMA





Specialist finishes within sensitive existing buildings
Harris Museum, Preston Bus Station, Preston Covered Market and Printworks demonstrate modern film, manifestation and signage specified to work within the requirements of the wider conservation or heritage project. The architect, conservation officer and project approvals remain important. We do not describe work as heritage compliant as a generic badge.
Retain suitable existing elements where replacement isn't necessary
Architectural film can offer a fit-out option where a substrate is structurally suitable, in acceptable condition and technically compatible, but its finish no longer meets the design brief. That can potentially mean less strip-out, fewer replacement components, less site activity and a shorter intervention. We do not use generic eco or green-fit-out claims, and we only use quantified project claims where evidence exists.
One subcontract partner across glass, signs, graphics and surfaces
Not every project contains all four categories. Where more than one is required, coordinating them through one specialist finishing contractor reduces the number of packages on the programme.
Glass
- Manifestation
- Privacy film
- Decorative film
- Reeded film
- Coloured reeded film
- Solar-control film
- Safety and security film
- Bespoke glass graphics
Signage
- External signs
- Internal signs
- Wayfinding
- Reception signs
- Room identification
- Illuminated signage
- Bespoke feature signage
Graphics
- Wall graphics
- Glass graphics
- Branding
- Hoarding
- Printed graphics
Surfaces
- Architectural film
- Doors
- Counters
- Wall panels
- Joinery
- Furniture
- Façade and cladding systems where suitable
Construction and fit-out proof
New build, fit-out, retail, healthcare, education, leisure, heritage and major commercial refurbishment — not a local heritage-only portfolio.

Flagship multi-package subcontract
Withington Girls' School
A main-contractor enquiry that expanded from manifestation into privacy film, architectural wrapping and bespoke signage.

Architect + main contractor + multi-service
Wesham Rehabilitation Centre
Frank Whittle architects and Eric Wright Construction — interior and exterior signage, murals, architectural wrapping and mirrored film.

Specialist glazing within a major renovation
Preston Bus Station
Safety film, manifestation and graphics on existing glazing as part of Conlon's renovation of a listed landmark.

Fit-out sequencing / off-site preparation
The Flower Bowl
Doors wrapped in the workshop before hanging, with larger architectural-film finishes completed on site plus solar-control film.

Shopfit / opening programme
Broadhurst Optometrists
Brought in by the shopfitting contractor and interior designer — hoarding through to illuminated shopfront.

Major commercial refurbishment
Printworks Manchester
Gateway entrances and public-realm upgrades within the site's £21m refurbishment.

Glazing / manifestation package
Everton / Bramley-Moore
Manifestation to newly glazed openings on a major development, working with the glazing contractor. Not a stadium-wide signage package.

Performance specification / high-level film
Harris Museum
External solar-control film selected around UV, heat and visible-light targets, installed to four roof atria.
Services used on construction and fit-out packages
Window film
Commercial glazing treatments specified around the installed glass.
Glass manifestation
Visibility treatments designed into the glazing package.
Privacy window film
Finish glazed partitions without changing the glass specification.
Reeded window film
Textured privacy on suitable flat glazing as an alternative to specialist glass.
Coloured reeded film
Bespoke-colour reeded treatments where the design brief calls for them.
Commercial solar control
Retrofit solar performance where replacing the glazing is not the only option.
Security & safety film
Impact, fragment-retention and specialist systems specified around the required evidence.
Architectural film
Change the finish on suitable doors, counters, panels and joinery.
Internal architectural film
Interior surface finishes for fit-out joinery, doors and feature elements.
External / façade architectural film
Façade and cladding film where the substrate and system permit it.
Signage
From sign schedule to installed system.
Bespoke signage
Feature identity, lettering and custom-fabricated signs.
Internal signage
Reception, room and directory signs for handover.
External signage
Building identity and approach signs specified around the package.
Illuminated signage
Lit signs coordinated around power, substrate and access interfaces.
Directional / wayfinding
Wayfinding systems specified from the sign schedule.
Retail signage
Shopfront and store identity for shopfit programmes.
Wall murals & graphics
Wall graphics, branding and construction hoarding.
Building-type pages for the occupier brief
This page answers why a contractor should appoint Lustalux. Occupier sector pages answer what is appropriate for the building type. Service pages answer which product or system is needed. London construction and fit-out programmes use the same subcontract model — see London window film installation. Manchester construction and fit-out programmes are covered on Manchester fit-out film and signage. Birmingham construction and fit-out programmes are covered on Birmingham fit-out film and signage. Liverpool construction and fit-out programmes are covered on Liverpool fit-out film and signage. Preston construction and fit-out programmes are covered on Preston fit-out film and signage. Scottish construction and fit-out programmes are covered on Scotland fit-out film and signage.
Offices & corporate
Workplace outcomes for occupiers — privacy, manifestation, solar control and reception finishes.
Education
Schools, colleges and universities — classroom heat, privacy, campus wayfinding and surface refresh.
Healthcare
Hospitals, clinics and clinical environments rather than construction-stage subcontract delivery.
Retail
Store operators and retail estates — shopfronts, window campaigns and occupied-store programmes.
Sports & leisure
Gyms, leisure centres, stadiums and visitor attractions as occupied venues.
Facilities management
Estate programmes after handover or during operational life, not construction-stage packages.
Industrial & commercial
Factories, warehouses, logistics sites and commercial units as operating sites.
Residential care
Occupied residential and nursing homes rather than construction-stage care-home fit-outs.
Questions contractors usually ask
Do you work directly for main contractors and fit-out contractors?
Yes. Lustalux works as a specialist subcontractor for main contractors, fit-out contractors, shopfitters, glazing contractors, partition contractors, architects, designers, project managers and quantity surveyors. We quote the agreed scope, survey where required, provide site documentation for commercial installations and coordinate around the project programme.
Can we send you drawings and specifications for pricing?
Yes. Send drawings, schedules, specifications, programme, site location and the tender-return date where relevant. Drawings let us understand design intent and scope. Where manufacture or installation depends on final built dimensions, a site survey or verified contractor dimensions may still be required before production. The current enquiry form does not accept file uploads — describe the documents in the brief or send them once we are in contact.
Do you provide RAMS?
Site and project-specific RAMS can be provided for the agreed commercial installation scope. That documentation relates to Lustalux's method of work, not the project's entire construction-phase health-and-safety file. The principal contractor remains responsible for managing and coordinating the construction phase where the project involves multiple contractors.
Are your installers CSCS carded?
CSCS is an individual skills-card scheme, not an organisational accreditation. CSCS-carded installation personnel can be provided where the site requires them. Tell us the site-card requirements at enquiry stage so we can confirm suitable personnel.
Do you have IPAF and PASMA trained installers?
IPAF covers powered-access training and PASMA covers mobile-access-tower training. Trained personnel can be provided for working-at-height installations, subject to survey of the actual access method. We do not advertise that we can install at any height without first reviewing access.
Can you help specify glass manifestation?
Yes, within Lustalux's agreed specialist scope. The final treatment should respond to the glazing, project design and applicable visibility requirements. For England, Approved Document K requires relevant transparent glazing to incorporate features that make it apparent where people are likely to come into contact with it. Scottish projects sit under Scottish Building Standards rather than Approved Document K. We do not describe manifestation as DDA certified. See glass manifestation.
Does BS EN 12600 cover blast mitigation?
No. BS EN 12600 is a pendulum impact test and classification standard for flat glass, concerned with impact performance and breakage characteristics. It is not a blast-mitigation standard. Safety-film systems can be specified where an existing-glazing assessment identifies a required impact or fragment-retention performance. Security and blast-mitigation systems require separate specialist specification around the glass, framing, attachment and defined threat or performance requirement. See security and safety film.
Can you work directly from architect drawings?
Often for initial scope, pricing and design review. Where bespoke manufacture depends on as-built conditions, verified site dimensions may still be required. Drawings and real-world dimensions play different roles.
Can you provide samples?
Yes, where appropriate. Depending on the package that can include film swatches, architectural-film finishes, printed colour samples, signage finishes, on-glass samples or mock-ups. Sample scope is agreed commercially — we do not promise full-size mock-ups for every tender.
Can you work to a contractor programme?
Yes, subject to agreed information, approval, material availability and site readiness. Installation is planned around an agreed window, not advertised as always on time or never delaying handover.
Can you work out of hours?
Often, where scope and site access allow. That is useful for occupied offices, retail, healthcare and refurbishment. Phasing, evenings, nights and weekends are planned around the site rules rather than promised as zero disruption.
Can you provide O&M / handover information?
Project-specific handover documentation can be provided where required within the agreed package. Agree the required product, warranty and maintenance information at order stage so it can be prepared for handover. We do not claim a comprehensive O&M pack is supplied on every small project.
Can you value-engineer an existing specification?
Potentially. Lustalux can suggest alternate films, materials or refurbishment routes where the required outcome can still be achieved, subject to client or designer approval. Value engineering can mean lower cost, shorter programme, easier installation, reduced strip-out, better availability or less weight — not automatically a cheaper product.
Pricing or delivering a construction project?
Send us the drawings, schedules, specification and programme. Whether the package covers manifestation, privacy film, architectural finishes, signage or several specialist scopes together, we'll review the information and define what we need to survey, approve and deliver before installation. Artwork and drawings can be described in the enquiry or sent once we are in contact — the current form does not accept file uploads.
Company, project name, location and contractor type
Main contractor, client, architect or designer if known
Project stage — tender or live — and tender-return date if applicable
Required-on-site date and practical-completion date
Required services: manifestation, privacy, reeded, solar, safety/security, architectural film, signage, graphics, hoarding or a multi-service package
Access requirements, working height and site contact
Drawings, schedules and specification — describe them here or send once we are in contact